Slide background

YEN BINH COMPLEX - THAI NGUYEN

Yen Binh urban, industrial, agricultural and services complexes project (called Complex Yen Binh) is invested by Yen Binh Investment and Development corporation (Yen Binh Company) and also provided to plan on an area of over 8,000 ha under two district which are Phu Binh and Pho Yen. This location is the center of the 5 major cities including Hanoi, ...
Slide background

HOANG MAI I INDUSTRIAL PARK - NGHE AN

Hoang Mai I Industrial Park was approved by Prime Minister orienting Nam Thanh-Bac Nghe construction planning; moreover, it is one of the Priority Industrial Zone in Vietnam. This area is expected to attract domestic and foreign investors and create an area for manufacturing industrial production facilities, handicraft industry ...
Slide background

HOANG MAI II INDUSTRIAL PARK - NGHE AN

Hoang Mai II Industrial Park was approved by Prime Minister on 09/10/2023 according to Decision No. 1164/QĐ-TTg on a planned area of 334.79ha. Hoang Mai II Industrial Park is expected to be a new destination for projects manufacturing/assembling electrical, electronic devices; projects in renewable energy industry…
Slide background

DUNG QUAT INDUSTRIAL TOWN - QUANG NGAI

Dung Quat Industrial Town has been invested in 2,000 billion dong by Hoang Thinh Dat Corporation. This project is expected to be breakthrough in infrastructures of Dung Quat Economic Zone and North Quang Ngai ‘s urban. Moreover, it will enlarge on Chu Lai Economic Zone and South Quang Nam where local government are …
Introduction Scale Invested Capital Duration Business Fields Advantages Service charge

Hoang Mai II Industrial Park – Nghe An

GENERAL INTRODUCTION

Following the success of Hoang Mai I Industrial Park in attracting FDI investment to Nghe An province, Hoang Mai II Industrial Park has been approved by the Prime Minister for investment as its investment policy according to Decision No. 1164/QD-TTg on October 9, 2023. Hoang Mai II Industrial Park is expected to become a new destination for projects in the fields of manufacturing, assembling electrical and electronic equipment, and production projects in the new energy and renewable energy industries.

SCALE

The total area of the Industrial Park is 334.79 ha, of which the land allocated for secondary investors to lease for workshop and factory investment is 232.25 ha (accounting for 69.45%). The Industrial Park plans a land fund of more than 15 ha (nearly 5%) to serve administrative buildings, offices, and services to serve the needs of customers in the Industrial Park.

NATURAL CONDITIONS

  • The plain terrain has an average elevation of 50m.
  • Good geological conditions, no flooding, and little need for land filling.
  • 24km from Nghi Son deep-water port.
  • 79km from Vinh airport.
  • 3km from the intersection of National Highway 48D and the North-South Expressway, reducing travel time between Hanoi and Hoang Mai to just 3 hours.
  • Located in the Southeast Nghe An Economic Zone.

INFRASTRUCTURE

  • Transportation, surface drainage:
    • Main road: 24m (Phase 1 completed with a width of 12m)
    • Internal roads: 11.5m
  • Electricity supply: The power supply for the Industrial Park is sourced from two 110kV substations with a capacity of 6x63MVA in the Industrial Park.
  • Wastewater treatment: After preliminary treatment to remove all chemicals exceeding Type B standards, the domestic wastewater m factories will be sent to the Industrial Park’s wastewater treatment plant to achieve Type A wastewater standards according to national standards before discharging into the Industrial Park’s drainage canal. The wastewater treatment plant in the Industrial Park has a maximum capacity of 30,000 m3/day-night.
  • Clean water: Clean water for the Industrial Park is supplied from the Hoang Mai Water Plant with a design capacity of 80,000 CMD, currently operating at 55,000 CMD and extracting 15,000 CMD.
  • Dormitory: Planning for 50.82 ha to build residential areas for workers.

TOTAL INVESTMENT CAPITAL

Total investment capital for the Hoang Mai II Industrial Park: 1900 billion VND.

PROJECT DURATION

The project’s operational period is 50 years from the date of the investment decision (until 2073).

INVESTMENT ATTRACTION FIELDS

  • Mechanical assembly industry;
  • Precision mechanical industry;
  • Manufacturing of electrical, electronic equipment, computer components, and optical products;
  • Manufacturing industry for spare parts serving manufacturing sectors and services;
  • Automotive and engine manufacturing industry, other transportation vehicles;
  • Manufacturing industry serving the new energy and renewable energy sectors;
  • Construction materials manufacturing industry, manufacturing of finished building products;
  • Chemical manufacturing industry and chemical products.

SERVICE CHARGES

1. Infrastructure usage fee (one-time payment) 55-60 USD/ m2 / until 2073
Depends on location and area
2. Land rental fee (annual payment, according to regulations) 0.06 USD/ m2/ year
3. Management, maintenance fee (annual payment)  0.05 USD/ m2/ month
4. Payment schedule Deposit (upon signing Land Lease Agreement): 10%

Upon signing Land Lease Contract: 50%

Upon land handover: 30%

Upon Land Use Right Certificate handover: 10%

5. Clean water fee 0.45 USD/ m3
6. Wastewater treatment fee (depends on quality) 0.35 – 0.85 USD/ m3
7. Infrastructure connection fee 6,000 USD
8. Electricity fee
Peak hours

Normal hours

Off-peak hours

3,093 VND/KWh = 0.13 USD/KWh

1,669 VND/KWh = 0.08 USD/KWh

1,084 VND/KWh = 0.05 USD/KWh

* Investors shall pay electricity fee to EVN following the exchange rate on payment date.

* Land rental fee is quoted according to Nghe An province’s regulations.

* All fees above are exclusive of VAT.

VISIT THE AREA

24km to Nghi Son Port
79km to Vinh Airport
Near North-South Expressway intersection

Partners

Contact Us

Hoang Thinh Dat Corporation

K7TT1-SH17, Central Area of Tay Ho Tay Urban Area, Xuan La Ward, Tay Ho District, Hanoi, Vietnam

Tel: +84 24 6 269 3838

Website: www.htdcorp.vn

Contact us