Slide background

YEN BINH COMPLEX - THAI NGUYEN

Yen Binh urban, industrial, agricultural and services complexes project (called Complex Yen Binh) is invested by Yen Binh Investment and Development corporation (Yen Binh Company) and also provided to plan on an area of over 8,000 ha under two district which are Phu Binh and Pho Yen. This location is the center of the 5 major cities including Hanoi, ...
Slide background

HOANG MAI I INDUSTRIAL PARK - NGHE AN

Hoang Mai I Industrial Park was approved by Prime Minister orienting Nam Thanh-Bac Nghe construction planning; moreover, it is one of the Priority Industrial Zone in Vietnam. This area is expected to attract domestic and foreign investors and create an area for manufacturing industrial production facilities, handicraft industry ...
Slide background

HOANG MAI II INDUSTRIAL PARK - NGHE AN

Hoang Mai II Industrial Park was approved by Prime Minister on 09/10/2023 according to Decision No. 1164/QĐ-TTg on a planned area of 334.79ha. Hoang Mai II Industrial Park is expected to be a new destination for projects manufacturing/assembling electrical, electronic devices; projects in renewable energy industry…
Slide background

DUNG QUAT INDUSTRIAL TOWN - QUANG NGAI

Dung Quat Industrial Town has been invested in 2,000 billion dong by Hoang Thinh Dat Corporation. This project is expected to be breakthrough in infrastructures of Dung Quat Economic Zone and North Quang Ngai ‘s urban. Moreover, it will enlarge on Chu Lai Economic Zone and South Quang Nam where local government are …

Centralize Steam Supply Project in Industrial Town

※ The above bird’s eye view is an image cut for understanding.  The realization of the Project can be different from the above image.

Merit of Centralize Steam Supply Project

ECO-FRIENDLY PROJECT SYSTEM

  • Compliance with Vietnam emission standards
  • Strict control of exhaust gas through Combustion Gas Treatment Facility

STABLE SUPPLY OF QUALIFIED STEAM

  • Fine Steam Quality – Stable Volume/ Pressure/ Temp.
  • Timely supply at the time required by individual firms in Industrial Park

SAVING OF INITIAL INVESTMENT AND STEAM GENERATION COST

  • No initial investment required from individual firms who need steam
  • Economically competitive price – Low construction, O&M cost
  • Competitive steam price

CREDIBLE PROJECT DEVELOPER

  • Hyundai Engineering Co., Ltd.
    • World-class EPC contractor from Korea
    • ENR (Engineering News-Record) 2016 Top International Design Firms 1st ranked in Korea and Asia

Project Outline

  • Project Name: Centralized Steam Supply Project in Dung Quat Industrial Park
  • Location: Dung Quat Economic Zone, Binh Son District, Quang Ngai, Vietnam
  • Capacity: 300 ton/h Steam supply + 7MW/h Captive Power (planned)
  • Project Period : 2019~2021 (planned)

 

Project Schedule 

  • End of 2018: Approval of Investment Plan
  • 2Q  of 2019: EPC + O&M Contract, Financing Closing
  • ’19.3Q~’21.2Q: Construction (total 24 months)
  • Operation: 20 years+α

 

3D Modeling (Design Concept)

The above 3D Modeling is an image cut for understanding.  The realization of the Project can be different from the above image.

  • Fuel Storage Facility
  • Incineration Facility
  • Boiler System
  • Electricity generation Facility
  • Combustion Gas Treatment Facility

 

CONTACT POINT

  • YOUNG SHIK, KIM (General Manager)
    Tel : +82-2-2134-1966 /  HP : +82-10-3730-2846  /  E-mail : kimsnet@hec.co.kr

 

  • HYOUNG SEOB, KIM (Manager)
    Tel : +82-2-2134-1963 /  HP : +82-10-7194-0221  /  E-mail : pigu99@hec.co.kr

 

Copyright © by Hyundai Engineering Co., Ltd.

All rights reserved. This material or any portion thereof may not be reproduced or used in any manner whatsoever without the express written permission of Hyundai Engineering Co., Ltd.

Further information, click below

Centralized_Steam_Supply_Project_Leaflet

Partners

Contact Us

Hoang Thinh Dat Corporation

K7TT1-SH17, Central Area of Tay Ho Tay Urban Area, Xuan La Ward, Tay Ho District, Hanoi, Vietnam

Tel: +84 24 6 269 3838

Website: www.htdcorp.vn

Contact us